Nicks workshop mutterings

Various railway orientated modelling projects in my new workshop/railway room.

Archive for the category “Rolling Stock”

progress

I have now completed the basic superstructure for the LNWR Precursor. These are the basic GEM castings which despite being over thirty years old, went together very well and required little if any cleaning up. Construction has ben a combination of epoxy resin and low melt soldering. I have added correct pattern LNWR buffers from 3mm society castings. The tender top was missing from the kit but I have constructed one from plasticard. The tender fittings are again sourced from the society.

The pictures below show the loco on Lakebank Mk2 the layout it is intended for. The picture also shows the new overbridge at the entrance to the layout. In the background is the joint in the scenery where the hill fits. This is made as a lift out piece to allow access to point switches and will eventually be disguised with ground foliage.

DSC_1862

DSC_1863

The next job is to add detail to the loco. This includes brake gear, boiler backhead , cab details, vacuum pipes etc. as well as filling the gaps in the castings.

Advertisements

LNWR Precursor

It has been a long time since I last posted on this blog. This is mainly due to the domestic demands of moving house!!

I have been involved in building a club layout at the Launceston and District MRC, my local. The layout is a reincarnation of a 14.2mm gauge 3mm scale layout first started over 25 years ago under the guidance of Iain Rice as a demonstration of the possibilities of 3mm scale.Due to a loss of club rooms the layout was dismantled but the trackwork and buildings were all saved. The layout is based on the ex Furness Railway in Cumbria, more about which I will blog later.

Modelling a different part of the country and a railway company I know little about has been a challenge. Discussing the stock we will need with Iain Rice it was felt that a Precursor would be useful. I have managed to acquire, courtesy of Ron Shuttleworth of the 3mm Society, one of the original GEM kits for a LNWR Precursor/King George Fifth, in whitemetal.

I have made a start on this by building  the chassis. The original kit was designed for 12mm gauge and had a cast whitemetal chassis!! This has been discarded and a 14.2mm gauge compensated chassis built instead.

DSC_1845

The side frames are from 3SMR and were deigned for the LSWR T9 which has the same wheelbase. The rear drivers are in fixed bearings while the front ones are in High Level hornblocks. The gear box is a 54:1 High Level Slim Liner one with a open frame Mashima motor. The bogie is the original GEM cast one with the addition of plasticard overlays to bring it too the correct width. The pivot point has been moved rearwards to allow the compensation beam to bear on the centre of the bogie.

I have found that this arrangement has stopped the front tipping forward with the weight of the cast boiler. As with all 4-4-0 chassis weight is need on the rear axle to get it to move and pull anything. This has been done with the usual arrangement of the tender applying the weight. I have again disposed of the cast chassis supplied in the kit and used an etched brass tender chassis supplied by Brian Golding. This allows the middle and front wheels to float in the chassis while the rear axle is fixed and the tender bears on the loco draw bar at the front. With extra weight in the tender this gives enough to provide good traction from the loco.

DSC_1846

Now to build the rest of the loco!

Improving slow running

I have always struggled with achieving good slow running without lots of stalling and poking with the hand of God. Some of it is down to getting the locos well run in and weighted. Unfortunately with the types of locomotives I am presently running it is difficult to get a lot of lead in.
Up to now I have concentrated on getting the track really clean and keeping the wheels well cleaned as well as getting as many pick-ups as I can. However at my last exhibition in St Albans I became very frustrated with the lack of good running, especially when shunting. Chatting with a narrow gauge modeller in the bar at the hotel, he suggested trying graphite as he had had a lot of success. He seemed to suffer the same problems with weight that I have (the locos that is!!).
Returning home, I erected the layout and set about rubbing the track with graphite. This is done using a hard graphite stick as used by artists. This was rubbed along the surface of the rails making sure that all the running rails, especially at pointwork, was covered. Slow running improved immediately and from what I have been told should continue to improve as more graphite is laid down along the rails and on the locomotive wheels. Time will tell!!

Post Navigation

sed30's Blog

Railways & other things

3mm Society

Various railway orientated modelling projects in my new workshop/railway room.

feather oak

Sharing our passion for free range specialist poultry, rare breed sheep and foraged loveliness

highland miscellany

My modelling musings on Portchullin, Glenmutchkins and anything else that takes my fancy.

Phil's Workbench

Various railway orientated modelling projects in my new workshop/railway room.

Kyle of Sutherland

The epic struggle to build a model railway exhibition layout at 4mm to the foot